What's New


NOTICE
CEDD Contract No. : NE/2017/05
Temporary Closure of the Slip Road Leading from Tai Po Road – Sha Tin Section (Southbound)
to Sha Tin Rural Committee Road (Eastbound) with Alternative Route
(Implementation Period: 12 a.m. to 5 a.m. on 12 September 2024)


Date: 5 September 2024

In order to facilitate the construction works under “Road Widening and Retrofitting Noise Barriers on Tai Po Road (Sha Tin Section)” project, the slip road leading from Tai Po Road – Sha Tin Section (Southbound) to Sha Tin Rural Committee Road (Eastbound) would be temporarily closed from 12 a.m. to 5 a.m. on 12 September 2024 for erection of noise barrier and related utilities.

During the construction period, the affected carriageway will be temporarily closed to all vehicular traffic. All vehicles shall take the alternative routes to Sha Tin Rural Committee Road (Eastbound) with the following temporary traffic arrangements (refer to the attached Figure):

  1. Road Closure
    1. The slip road leading from Tai Po Road – Sha Tin Section (Southbound) to Sha Tin Rural Committee Road (Eastbound)
  2. Banning of Turning Movements
    1. Turning left from slip road of Tai Po Road – Sha Tin Section (Southbound) to Sha Tin Rural Committee Road (Eastbound) will be prohibited for all vehicular traffic
  3. Traffic Diversion
    1. Affected vehicles on Tai Po Road (Southbound) heading for Sha Tin Rural Committee Road (Eastbound) will be diverted via Pai Tau Street.

Appropriate traffic signs will be erected on site to guide motorists in the above-mentioned location during the temporary road diversion.

We apologize for any inconvenience caused. Should you have any enquiry, please do not hesitate to call our 24-hour Hotline 5613-3367 to contact our Construction Manager, Mr. Wong.

China Railway–China Railway First Group–Zhen Hua Engineering Joint Venture

Top