What's New


NOTICE
CEDD Contract No. : NE/2017/05
Temporary Closure of the Slip Road Leading from Fo Tan Road
to Kowloon and Tsuen Wan Direction
of Tai Po Road – Sha Tin (Southbound) with Alternative Route
(Implementation Period: 0.30 a.m. to 5 a.m. on 12, 13, 26, 27 June
and 3 & 4 July 2024)


Date: 6 June 2024

In order to facilitate the construction works under “Road Widening and Retrofitting Noise Barriers on Tai Po Road (Sha Tin Section)” project, the slip road leading from Fo Tan to Kowloon and Tsuen Wan Direction of Tai Po Road – Sha Tin (Southbound) would be temporarily closed from 0.30 a.m. to 5 a.m. on 12, 13, 26, 27 June and 3 & 4 July 2024 for erection of noise barrier and related utilities.

During the construction period, the affected carriageway will be temporarily closed to all vehicular traffic. All vehicles shall take the alternative routes to Kowloon (West) and Tsuen Wan with the following temporary traffic arrangements (refer to the attached Figure):

  1. Ban Turning
    1. All vehicles will be temporarily prohibited from making right turn movement from Fo Tan Road (Eastbound) to Tai Po Road – Sha Tin (Southbound)
    2. All vehicles will be temporarily prohibited from making left turn movement from Fo Tan Road (Westbound) to Tai Po Road – Sha Tin (Southbound)
  2. Traffic Diversion
    1. Vehicles towards Kowloon (West) and Tsuen Wan Direction will be diverted via Yuen Wo Road (Southbound) and Sha Tin Rural Committee Road (Westbound)

Appropriate traffic signs will be erected on site to guide motorists in the above mentioned location during the temporary road diversion.

We apologize for any inconvenience caused. Should you have any enquiry, please do not hesitate to call our 24-hour Hotline 5613-3367 to contact our Construction Manager, Mr. Wong.

China Railway–China Railway First Group–Zhen Hua Engineering Joint Venture

Top