What's New


NOTICE
CEDD Contract No. : NE/2017/05
Temporary Closure Arrangement of Tai Po Road - Sha Tin Section (Tai Po Bound)
near Sha Tin Rural Committee Road to
a section of Tsing Sha Highway and Shing Mun Tunnel Road
(Implementation Period: 1 a.m. to 6 a.m. on 2 June 2024)


Date: 27 May 2024

In order to facilitate the construction works under “Road Widening and Retrofitting Noise Barriers on Tai Po Road (Sha Tin Section)” project, the slip road leading from Tai Po Road - Sha Tin Section (Tai Po Bound) near Sha Tin Rural Committee Road to a section of Tsing Sha Highway and Shing Mun Tunnel Road would be temporarily closed from 1 a.m. to 6 a.m. on 2 June 2024 for the road marking modification works (location refer to the attached Figure). The southbound traffic will not be affected..

During the works period, driving lanes will be temporarily closed for all vehicles. The following traffic diversion arrangements will be implemented (refer to the attached Figure):

  1. Affected vehicles travelling in Shing Mun Tunnel Road travelling to Tai Po direction will be diverted via slip road to Tai Po Road (Tai Wai Section) → Mei Tin Road → Che Kung Miu Road → Tai Chung Kiu Road → Sha Tin Rural Committee Road → Tai Po Road (Sha Tin Section);
  2. Affected vehicles travelling in Tsing Sha Highway will be diverted via slip road to Mei Tin Road → Tai Po Road (Tai Wai Section) → Sha Tin Centre Street → Wang Pok Street → Yuen Wo Road → Sha Tin Rural Committee Road → Tai Po Road (Sha Tin Section);
  3. Affected vehicles travelling in Mei Tin Road will be diverted via Tai Po Road (Tai Wai Section) → Sha Tin Centre Street → Wang Pok Street → Yuen Wo Road → Sha Tin Rural Committee Road → Tai Po Road (Sha Tin Section);
  4. Traveling from the roundabout at Tai Wai New Village to Tsing Sha Highway will be diverted to Chik Wan Street → Mei Tin Road → Tai Po Road (Tai Wai Section) → Sha Tin Centre Street → Wang Pok Street → Yuen Wo Road → Sha Tin Rural Committee Road → Tai Po Road (Sha Tin Section).

Appropriate traffic signs will be erected on site to guide motorists.

We apologize for any inconvenience caused. Should you have any enquiry, please do not hesitate to call our 24-hour Hotline 5613-3367 to contact us.

China Railway–China Railway First Group–Zhen Hua Engineering Joint Venture

Top